Thursday, April 15, 2021

Progress made

Plumber has been here since Monday working on all the stub ups, peatraps and drains.  Lots of progress has been made and hes a great guy.
If you look close at this picture you can see 4 pieces of rebar.  Those represent the drain lines for the guest bath.  We had a meeting yesterday about this bathroom.  I had just enough architecture classes in college to make me dangerous!  So even though I thought I'd drawn things to scale I hadn't and because I want a particular shower and a separate tub in here we had to draw it all out on paper several times to get it right.  And we did and I'm very happy.  But for the life of me now I cannot tell you how it all goes.  
This is mud room where washer, dryer, small utility sink, water heater, water conditioner, breaker box, spare fridge and spare freezer goes.  Seems like a lot in this room but breaker box goes recessed in the wall.  Water heater is an on demand system so it's a small unit mounted on the wall.  Water Conditioner fits under the water heater, washer, dryer and utility sink on a wall and other wall is for fridge and freezer.  
Looking from the back wall of the house past the kitchen and toward the master bedroom bath at the corner.
Drain in master shower.
Front left corner of the house where our bedroom will be, then master closet and master bath.
Right corner of house where 2 bedrooms, a guest bath, a fly tying room for Bob, the pantry and mud room will be.  
Just another shot from right front angle to back left of house.
Plumber thinks he will finish up today provided he gets the specs for the water conditioner.  Hopefully sometime this morning.  After he does that then he can smooth top, and put on plastic.  After that the concrete guys come and place and tie rebar and then pour.  No date on that yet we have to wait until plumber is finished.