Saturday, January 22, 2022

This Week

The rock work around the house proper is about 99.9% done.  
They have started on the columns and the 2 in the front are done and they are currently working on the 3 in the back.  
The tile guy was here this week and he was able to bed both shower bottoms and he tiled ( pebbled) the master shower and grouted it.
Here is the guest shower being tiled.
The texture guys are here today so pictures in another post.